Solar power is an increasingly important source for electricity generation. Photovoltaic systems in particular are becoming more and more widespread, thanks to their ability to convert solar energy into electricity. However, to install a photovoltaic system it is necessary to follow an authorisation procedure involving a series of phases and steps.

In this article we will focus on the authorisation procedure for photovoltaic systems, analysing the different phases it consists of and the steps needed to complete it successfully.

Phase 1: Administrative authorisation

The first phase of the authorisation procedure for photovoltaic systems consists of obtaining administrative authorisation. This authorisation is issued by the competent municipality or province, in accordance with national and regional legislation.

In this phase, a number of documents must be submitted, including:

  • Technical documentation of the system, including a description of the photovoltaic modules, the inverter and the protection devices.
  • Documentation on the environmental impact of the system, including an environmental impact report and a hydrogeological risk assessment.
  • Documentation on safety and fire prevention procedures.
  • Documentation on access to and use of the land on which the system will be installed.
  • Authorisations and permits required from other authorities (for example, authorisations from the Land Agency for land occupation).

Once all the required documentation has been submitted, the competent municipality or province will carry out a series of checks and reviews to assess the feasibility of installing the system.

Phase 2: Landscape authorisation

The second phase of the authorisation procedure for photovoltaic systems is landscape authorisation. This authorisation is issued by the competent region and involves a series of assessments of the compatibility of the system with the landscape and the surrounding environment.

In this phase, a number of documents must be submitted, including:

  • A technical report on the system and its landscape impact.
  • A landscape integration project, describing the solutions adopted to minimise the visual impact of the system.
  • An assessment of the noise impact of the system.
  • An assessment of the impact on the ecosystem and biodiversity.

Once all the required documentation has been submitted, the competent region will carry out a series of checks and reviews to assess the compatibility of the system with the landscape and the surrounding environment.

Phase 3: Grid connection authorisation

Authorisation: if the application is approved, the connection authorisation is issued.

Once the authorisation has been obtained, the installation of the photovoltaic system can go ahead. It is important to make sure that the installation is carried out by specialised personnel and in compliance with current regulations.

Phase 4: Installation and testing of the system

Once landscape authorisation has been obtained (where required), the photovoltaic system can be installed. During this phase, the requirements set out in the building permit and in the landscape authorisation (where required) must be complied with.

After the photovoltaic system has been installed, authorisation to operate it must be requested. This authorisation is issued by the GSE (Gestore dei Servizi Energetici, the Italian Energy Services Operator) and gives access to the incentives provided by the Conto Energia scheme. The request for authorisation to operate must be submitted to the GSE within 60 days of the photovoltaic system entering into operation. The request must include a number of documents, including the declaration of conformity of the photovoltaic system and the certificate of connection to the national power grid. In addition, a series of information on the system must be provided, such as the installed capacity, the date of entry into operation, the type of solar panels used and the method of connection to the power grid.

After obtaining authorisation to operate the photovoltaic system, it is possible to access the incentives provided by the Conto Energia scheme. These incentives consist of a financial contribution paid by the GSE based on the amount of electricity produced by the photovoltaic system. The Conto Energia is a long-term incentive that guarantees a stable income for investors in solar energy.

AUTHORISATION SIMPLIFICATIONS FOR PHOTOVOLTAIC AND WIND PLANTS – 2023 UPDATE

We already covered this subject extensively in 2022, describing in detail the authorisation procedure for photovoltaic plants, updated to the legislation of the previous year.

Decree-Law 13/2023 containing “Urgent provisions for the implementation of the NRRP” was recently published in the Official Gazette.
The measure, in force since Saturday 25 February 2023, must now be converted into law and contains a number of new provisions for renewable sources, including reduced buffer zones, exemptions from the Environmental Impact Assessment (EIA) and simplifications for agrivoltaic projects.

Renewable sources
As regards renewables (art. 47), we note the following measures:
– the procedure for installing photovoltaic systems in industrial, craft and commercial areas, as well as in landfills and quarries no longer in use, has been simplified; their installation is in fact considered “ordinary maintenance activity and is not subject to obtaining permits, authorisations or consents of any kind”;
A simple DIL (Declaration of Start of Works) would therefore be sufficient. However, we will have to wait for the conversion into law (deadline 24/04/2023), which could introduce some changes.

Conclusions

As we have seen, the authorisation procedure for installing a photovoltaic system can be quite complex. It is therefore essential to rely on professionals who can follow the project from its conception through to actual completion. For over 30 years, Warex has specialised in building photovoltaic plants in Italy and abroad.