Decree 17/2022 (whose conversion law no. 32/2022 was published in the Italian Official Gazette on 28 April 2022, in force since 29 April 2022) aims (among other measures) to simplify the regulatory framework for renewables.
We have highlighted the most important measures for renewable energy plants
1. Suitable areas
Although the ministerial decrees and regional laws identifying the actual areas have not yet been approved, the decree adds areas that are deemed suitable in the meantime. These areas benefit from faster administrative procedures (this also applies to administrative procedures currently pending).
1.1. New areas and further amendments to Legislative Decree 199/2021
We are still waiting for the guidelines of the Ministry of Ecological Transition (MITE) to identify the “suitable areas” as provided for by Legislative Decree 199/2021. These guidelines will be issued by 13 June 2022, and the Regions must use them as a reference to identify suitable areas within their regional territory in the following 180 days.
The Decree now provides for a series of adjustments.
1.1.1. The Decree provides that the MITE, when giving guidance to the Regions for identifying suitable areas, must also consider industrial, craft, service and logistics areas as suitable (in addition to built-up areas, e.g. industrial sheds and car parks).
1.1.2. The Decree extends the areas that Legislative Decree no. 199/2021 considers suitable “ex lege”, to which, as we will analyse in paragraph 1.2 below, certain simplifications will apply.
In particular, these new areas are:
• For ground-mounted photovoltaics in areas not subject to constraints:
– agricultural areas located no more than 300 metres from industrial, craft and commercial areas (including sites of national interest), or from quarries and mines;
– areas within industrial sites and agricultural areas located no more than 300 metres from the same industrial sites (this may be extended to 500 m);
– areas located no more than 150 metres from motorways (this may be extended to 300 m).
Note that the new areas will be added to the areas already considered suitable “ex lege” by Legislative Decree no. 199/2021:
- Areas where plants of the same type are already installed and where non-substantial modifications have been carried out and, for photovoltaics, areas where photovoltaic plants have already been built and where substantial modifications have been made for the renovation, upgrading or complete rebuilding of the plant, including the integration of storage systems with a capacity of no more than 3 MWh for each MW of photovoltaic plant capacity.
- Areas subject to remediation
- Disused quarries and mines that have not been restored, or that are abandoned or in a state of environmental degradation
- Areas whose property rights are held by companies of the FSI Group (Italian State Railways)
1.2. Simplification of administrative procedures
As mentioned, plants to be built in suitable areas – including those considered suitable “ex lege” as per point 1.1.2 above – will benefit from simplified authorisation procedures.
1.2.1. These are the new procedures and requirements:
- Sworn declaration of start of works (Dichiarazione di inizio lavori asseverata) for all works (including connected and essential infrastructure): for plants of up to 1 MW in areas that
(i) are available to the applicant (for which no expropriation procedures are planned),
(ii) are not subject to the protection rules laid down by the Code of Cultural Heritage, and
(iii) are outside “Zone A”; - Simplified Municipal Procedure (PAS): for plants with a capacity of more than 1 MW and up to 10 MW;
- Single Authorisation (AU): for plants with a capacity of more than 10 MW.
1.2.2. An important confirmation from the conversion law (briefly analysed here) concerns the acceleration of authorisation procedures for plants built in areas classified as suitable: the opinion of the competent landscape authority is now considered mandatory but not binding, also in Environmental Impact Assessment procedures and not only (as in the past) in the procedures for issuing the single authorisation under Legislative Decree 387/2003. This means that if the deadline expires before the landscape authority issues its non-binding opinion, the competent administration is nevertheless required to decide on the authorisation request and/or the environmental assessment.
1.3. Pending procedures
The conversion law also brings some important clarifications for pending procedures.
1.3.1. The Decree specifies that the simplifications described in paragraph 1.2 above will also apply, at the applicant’s request, to procedures in areas considered suitable “ex lege” that were pending on the date the conversion law entered into force (i.e. 29 April 2022).
1.3.2. In addition, the Decree provides that procedures pending on 29 April 2022 and relating to projects located in areas that are:
a) not subject to any constraint and
b) not included in areas declared “unsuitable” under regional regulations, will be simplified as if they were procedures in suitable areas, meaning that:
(i) the opinion of the competent environmental authority is mandatory but not binding (as described in 1.2.2 above), and
(ii) the time allowed for the authorisation procedures will be shortened by one third.
2. Simplified municipal procedure (Procedura Abilitativa Semplificata – PAS)
The fastest of the authorisation procedures is now extended to photovoltaics built in new areas, with the aim of speeding up administrative procedures. These plants will not need to undergo Environmental Impact Assessment screening.
2.1. New areas for PAS procedures
The areas in which the PAS applies have been extended and include the following:
• Photovoltaics up to 20 MW and works to connect to the medium- and high-voltage grid (previously only medium voltage was provided for) in:
– Industrial, productive and commercial areas
– Landfills or landfill lots that have been closed or restored
– Quarries or quarry lots that are unsuitable for further exploitation and have been restored.
• Plants in areas classified as suitable under Legislative Decree 199/2021 and areas classified as suitable “ex lege” (up to 10 MW. See 1.1.2 above)
• Agrivoltaic plants located no more than three kilometres from industrial, productive or commercial areas
2.2. Exemption from Environmental Impact Assessment screening
To further simplify the procedure, for these types of plants with a capacity of up to 20 MW, Environmental Impact Assessment screening is not required, provided that the applicant attaches a self-declaration stating that the plant is not located in areas that the MISE guidelines of 10 September 2010 consider unsuitable (areas that are particularly sensitive and/or vulnerable to territorial transformations of the landscape, e.g. Natura 2000 Network, UNESCO sites, etc.).
The Decree also specifies that direct construction under the PAS procedure also applies when urban planning requires implementation plans for construction.
3. Agrivoltaic plants
Although incentives for renewables in agricultural areas remain precluded, agrivoltaic plants can now apply for new incentives planned by the government (but yet to be implemented), without the previous limit of 10 per cent use of agricultural land.
3.1. Access to incentives
Under Italian law, agrivoltaic plants are plants that adopt innovative integrated solutions, with modules installed raised above the ground, possibly also with rotating modules, in any case so as not to compromise the continuity of farming and grazing activities.
Access to incentives (which, moreover, are still to be transposed through the relevant ministerial decrees) is now open to agrivoltaics regardless of the percentage of agricultural land used, but subject to the simultaneous implementation of monitoring systems that make it possible to verify the impact on crops, water savings, agricultural productivity for the different types of crops and business continuity.
These monitoring systems will be the subject of guidelines adopted by CREA in collaboration with the GSE within 30 days of the Decree entering into force.
3.2. PAS
As mentioned in paragraph 2.1 above, the PAS now applies to agrivoltaic plants located no more than three kilometres from industrial, productive or commercial areas, and for these plants (with a capacity of up to 20 MW) Environmental Impact Assessment screening is not required, provided that the applicant attaches a self-declaration stating that the plant is not located in areas that the MISE guidelines of 10 September 2010 consider unsuitable.
3.3. The 10-year limit
The Decree also introduces a new limit. Plots of land on which agrivoltaic plants are located may no longer be used for further photovoltaic installations for 10 years after the granting of state incentives. The Decree establishes that this limit also applies following the subdivision or transfer of the land for any reason.
4. Floating photovoltaic plants
A new era for floating systems. New simplification procedures (PAS) and incentives have been introduced to speed up new installations.
4.1. Applicability of the Simplified Municipal Procedure (PAS) and exemption from the EIA procedure
The Simplified Municipal Procedure can now be used for floating photovoltaic plants of up to 10 MW built on:
• Ponds
• Water reservoirs
• Water reservoirs in disused quarries, or installed to cover irrigation canals
However, the Decree provides that the MITE, by its own decree, within 90 days of the issue of the Decree, shall establish the criteria for the installation and environmental integration of the plants in order to balance the solar exposure of the water body and the positioning of the plant in relation to the banks and depth of the basin. The implementation of these measures therefore depends on the MITE decrees.
4.2. Access to incentives
Floating photovoltaic plants that have yet to be built will also be eligible for incentives. However, these incentives will be subject to the 10-year limitation described in paragraph 3.3 above for agrivoltaics.
5. Photovoltaics in industrial areas
In industrial areas, plants can be installed even by way of derogation from local urban plans, with a newly introduced limit of 60 per cent of the relevant industrial surface.
The Decree provides that in industrial areas the installation of solar photovoltaic and thermal systems may cover an area of up to 60 per cent of the relevant industrial surface, even by way of derogation from the municipality’s urban planning instruments and existing coverage ratios.
These plants could also be installed on specially built support structures.
6. Photovoltaics on roofs and buildings
Rooftop photovoltaic plants will not be subject to any authorisation (so-called “free building activity”). The single simplified form is extended to photovoltaic and thermal plants with a capacity of up to 200 kW.
6.1. General simplification rules for rooftop installations
The Decree now considers the following as “free building activity”:
- Installation of photovoltaic and thermal systems on buildings, or on above-ground structures and constructions other than buildings (including ski facilities), and works related to their connection to the power grid
- External renovations and adaptations of connection works in the area of the same buildings
This means that, since they are now considered by the legislator as ordinary maintenance works, carrying out such works is not subject to obtaining permits, authorisations or any other administrative act, including those provided for by the Code of Cultural Heritage and Landscape.
However, there are exceptions for plants installed on buildings, or on buildings in areas such as
(i) villas, gardens and parks of “uncommon beauty” and
(ii) buildings that “have a characteristic appearance with aesthetic features and traditional value”, including those in historic centres.
To install plants on such buildings, prior authorisation from the competent administration is required.
In historic centres, where the modules are integrated into the roofs and are not visible from public spaces or viewpoints, the above simplification will apply; however, plants built on roofs made of traditional local materials do not benefit from this simplification.
6.2. The single simplified form for rooftop installations up to 200 kW
From 15 April 2022, the single simplified form was introduced for small rooftop renewable installations. This form was initially introduced for plants up to 50 kW. The MITE will now identify, within 60 days, the conditions and procedures for extending this simplified form to rooftop and building installations with a capacity of up to 200 kW. We would point out that, with the single simplified form, it will also be possible to apply directly for incentives once the implementing decrees come into force.
7. Simplification for wind and photovoltaic repowering and revamping
Following the path already set by the Simplifications-bis Decree, the Sworn Declaration of Start of Works (DILA) is now sufficient for non-substantial modifications to plants and projects. New quantitative specifications for considering modifications to wind plants as non-substantial.
7.1. Simplifications for non-substantial modifications to plants
For non-substantial modifications to a plant (i) to increase installed capacity, or (ii) that are needed for further connected works, and that do not increase the surface covered by the plant, operators now only need to submit the sworn declaration of start of works (Dichiarazione di inizio lavori asseverata), except in areas that have not previously been subject to archaeological assessment. In that case, a prior check of archaeological interest is required.
7.2. Simplification for wind plants
Non-substantial modifications to wind projects/plants and connected works which, regardless of their outcome, are carried out on the same site as the plant are subject to the simplified procedure of the Communication of free building activity. In addition, the Decree has amended the quantitative specifications for considering such modifications “non-substantial”.
8. Self-consumption of renewable energy
Companies and condominiums will be able to become self-consumers by connecting to renewable energy production plants located in buildings or sites other than the one in which they operate, subject to certain limitations.
8.1. New definition of renewable energy self-consumers
The Decree provides for two categories of “remote self-consumption”:
- Direct connection, provided that the connection line between the place of energy consumption and the place of energy production does not exceed 10 kilometres and that no users other than the producer and the single consumer are connected.
- Use of an existing distribution grid to share the energy produced by the renewable plant. Energy consumption must then take place at withdrawal points owned by the same self-consumer.
8.2. Access to incentives
Self-consumers will then be able to apply for the incentives provided for by Legislative Decree 199/2021, which will be further described in specific decrees of the Minister for Ecological Transition, when they are published on 15 June 2022.
- The self-consumers referred to in the first point of paragraph 8.1 above will be able to apply for incentives which, depending on the size of the plant, may be those provided for
i) plants above 1 MW,
ii) small plants (those below 1 MW), or
iii) collective self-consumers and renewable energy communities. - The self-consumers referred to in the second point of paragraph 8.1 above will only be able to apply for the incentives offered to self-consumers and renewable energy communities.
9. Expropriation for public utility – grid connections
The Decree introduces new possible forms of compatibility with civic uses. It also declares the regional opinion on the compatibility of the works unnecessary if it is not communicated in good time. The DILA will now be required for changes to works consisting of switching from overhead lines to underground cables.
9.1. Civic uses
Land burdened by so-called “civic use” (usi civici) cannot as a rule be expropriated unless a change of intended use is declared by the competent public authority, with the exception of “works of public utility” deemed compatible with civic uses.
The Decree now provides for new possible forms of compatibility with civic uses as regards grid connection:
• Construction of power lines, without prejudice, however, to the possibility for the respective region or delegated municipality to comment on a case-by-case basis, with appropriate reasons, within the authorisation procedure
• Reconstruction of existing overhead or underground power lines that becomes necessary due to their obsolescence. This applies provided they are built with the best existing technologies and follow the same route as the existing power line or its immediate vicinity. The Decree also provides that, if the respective Regions do not express their opinion on the compatibility of the works with civic uses as regards the construction of national power lines, compatibility is deemed confirmed.
9.2. “Declaration of start of activity” for cable ducts
For changes consisting of switching from overhead lines to underground cables, it will only be necessary to submit a declaration of start of works. These works, however, are subject to size limits. They must not i) involve changes in length of more than 1,500 metres or ii) involve changes in length of more than 3,000 metres, provided that they do not fall, even partially, within protected natural areas and that they use the same route or deviate from it by no more than 60 metres.
You can read the 2023 legislative updates at this link